Liebherr-International Deutschland GmbH | Oberopfingen
ENERGY CENTER
From the initial planning idea to the complex overall concept of the new Liebherr logistics centre in Oberopfingen. No matter how extensive the challenges, we always look for the best individual implementation for the customer. From the big idea, to a holistic concept, to the smallest detail, tinkered and filed until an optimal overall solution has been defined. From the planning in perfection to the maintenance in every detail. It is the small things that can make a big difference.
Block-type thermal power station | heating cooling | ventilation
- Oil / gas condensing boiler Nominal heat output: 2,560 kW
- CHP Nominal heat output thermal: 588 kW | electrical 495 kW
- heating pipes of 17.2 km length
- heating / cooling ceiling 3.000 m²
- Split systems around 100 kW
- Building cooling Cooling capacity 185 kW
- cooling pipes of 4.1 km length
- Ventilation systems / air volume 200 – 5,200 m³ / h
- Sanitary facilities 280 pieces
- Sanitary pipes 11.7 km length