CB-tec GmbH

During the construction of the company headquarters of CB-tec GmbH in Ungerhausen, one of the leading companies for furnace construction materials, district heating pipes for concrete core activation and PE pipes for machine connections were laid under the floor slabs in the new production and warehouse hall. In addition, an energy center for heat and cold distribution was built. The natural stone expert receives the climate-neutral energy (heat and cold) via a local heating network from the neighbouring Green Factory of Alois Müller GmbH. Furthermore, the new offices were equipped with sanitary facilities and heating and cooling ceilings.

Production and warehouse  

  • District heating pipe for concrete core activation
  • PE lines (compressed air and water)
  • 10.000 m² concrete core temperature control
  • anitary area with ventilation system
  • Floor heating in the showroom
  • Energy center

Office building

  • Radiant cooling ceilings
  • toilet areas
  • Ventilation system
Energy center  CB-tec GmbH

Energy center CB-tec GmbH

Energy center CB-tec GmbH

Energy center  CB-tec GmbH

Energy center CB-tec GmbH

Energy center CB-tec GmbH

Energy center  CB-tec GmbH

Energy center CB-tec GmbH

Energy center CB-tec GmbH

Energy center  CB-tec GmbH

Energy center CB-tec GmbH

Energy center CB-tec GmbH

Sanitary area

Sanitary area

Sanitary area

Sanitary area

Sanitary area

Sanitary area

CB-tec GmbH

CB-tec GmbH

CB-tec GmbH

Production CB-tec GmbH

Production CB-tec GmbH

Production CB-tec GmbH